Recent projects of Stork Railway Services
| VOLKER RAIL - Fast refurbishment of wheels & bogies Our customer Volker Rail needed a supplier who was able to refurbish 3 bogies and 2 separate wheelsets within a very tight time schedule of 2 weeks.... Extremely fast response time of Stork Railway Services » |
![]() | |
| SPENO - Onsite wheel seal replacement of MAK 6400 One of the trains of Speno International had oil leakage in the gearboxes. They needed immediate action. Stork Railway Services took immediate action and went to Poland for inspection and fast repair. Onsite wheelset seals replacement in Poland » |
![]() | |
| BAM RAIL- Wheelset replacement As a result of our long experience and the use of our unique Dieffenbacher wheelpress we were asked to replace the wheelsets of the Plasser & Theurer maintenance train for BAM railway as part of the timebased overhaul. Replacing wheelset for BAM rail » |
![]() | |
|
RMO - Gearbox reconditioning |
![]() |
|
HTM - midlife overhaul |
![]() |
|
Stadler GTW - Gearbox for motorbogie |
![]() |
| Technoservice NL- Repair OF primary suspension Stork Railway Services was asked to repair the clamping of the primary suspension for the FTD - Protos. With our inhouse equipment and bogie test plant we managed to succeed the project within the customer's specifications and timeline. Repair of primary suspension of Protos » |
![]() |
| Technoservice NL- Protos fast damagerepair of bogie Due to a collision with a car on a railcrossing, the bogie of a FTD Protos train was heavily damaged. For our customer it was of the utmost importance to finish the repairs in a very tight time scedule. Stork Railway Services was hired for the damagerepair. Damage Protos bogie repair » |
![]() |
| BOMBARDIER - bearings replacement Bombardier developed almost 400 VIRM trains specially for The Netherlands. Stork Railway Services was hired for the replacement of bearings in full accordance with technical standards of SKF. Bombardier project ..» |
![]() | |
| SPENO - bogie overhaul of railgrinders Railgrinders are of vital importance for the safety and reliability of the Dutch railways. Within a timeline of 4 weeks we managed to complete the whole bogie overhaul project, also including revision of the breaks and wheels. Speno project ..» |
![]() | |
| SYNTUS - damagerepair of LINT train Stork Railway Services was hired for the damagerepair of a LINT train. These passenger two-piece railcars are mainly used in the eastern provinces in the Netherlands. LINT project ..» |
![]() | |
| ALSTOM -Condition monitoring of Alstom bogies Due to increasing urbanization and developing outer-city regions nowadays many Intercity trains are being developed. Railway Services was hired for monitoring services. Alstom project ..» |
![]() | |
| GVB - Maintenance and bogie overhaul of rapid trams GVB provides public transport that is a safe and attractive alternative to the bicycle and car. Stork Railway Services was part of the start up of the overhaul projectmanagement and performed the revision of the rapid tram. GVB Project ..» |
![]() | |
| RET - Overhaul of Randstadrail vehicles Randstadrail is a new light rail system in the Dutch province Zuid-Holland that will connect The Hague with Rotterdam and Zoetermeer. Stork Railway Services was hired to carry out the overhaul of metro vehicles for RandstadRail Randstadrail project ....» |
![]() | |
| SYNTUS - Damagerepair and completion of two bogies A derailment of a train caused severe damage to the frame. Stork Railway Services was hired for the damagerepair of two bogies. Syntus project...» |
![]() |