Composite Repair - Buried pipeline repair
Stork was contracted to deliver a composite repair solution, which would provide corrosion protection in conjunction with a Cathodic Protection (CP) system, for a buried pipeline at a North Sea terminal.
Downloads |
|||
---|---|---|---|
![]() |
Buried_Pipeline_Repair_Case_Study | 112 KB | Download |