NDT - Conductor inspection

Stork was challenged to inspect and clean a 144 meter long conductor on a North Sea offshore platform. The objective was to evaluate the condition of the conductor to ensure its integrity and confirm its conformance with HSE legislative standards.

Downloads

pdf Inspection__NDT_Conductor_Inspection_Case_Study 212 KB Download
Share this article