Sea Invest Tank Terminal

Sea Invest Tank Terminal

Stork was commissioned to do the complete piping prefabrication for a new tank terminal with jetty in the harbour of Antwerp at quay 510. The entire project was tied to a severe milestone planning. The client requested high quality standards according to PED category 1 and 2 and demanded full traceability. There was only a very limited on-site lay-down area available for installation and on-site work. Therefore site construction work had to be reduced to a minimum.

Download PDF-Version