Lessons Learned - Inhalation of Gas
A workscope to apply a non-Stork composite wrap to a bend on a flare line was planned and a Working Instruction with associated Method Statement was produced for the work party to follow. It was then identified that a wear plate would also be required between the flare line and the composite wrap. Perceived time pressure was felt by the work party to meet a deadline.
Whilst the Work Instructions and Method Statement were being amended an e-mail outlining the revised repair strategy was sent offshore and the work party was given the e-mail and instructed to progress the task on that basis.
Please download the Lessons Learned for more information.