During UHP operations, the crew had to shut down for equipment relocation of equipment staging on the deck area.  During the lifting operation, the air prep was struck against another piece of equipment breaking off the air regulator at the base of the connector.

During UHP operations, the crew had to shut down for equipment relocation of equipment staging on the deck area.  During the lifting operation, the air prep was struck against another piece of equipment breaking off the air regulator at the base of the connector.