Lessons Learned - Wrong Equipment Back Loaded

A Hydraulic Power Unit (HPU) on board a North Sea offshore  installation, which was required for a cutting operation, was mistaken for a Hot Jet Unit (HJU) and back-loaded.  As a result, the cutting operation was delayed for several days until the tool was shipped back offshore.

 

Click on the below link to learn more about the incident investigation findings and key lessons learned. Please also remember to download a copy and circulate around your teams, both on and offshore.