DESIGN & MANUFACTURING
Engineering capabilities
As a technology driven company, Stork Turbo Blading is constantly developing and improving its processes. In the area of engineering we continually invest in systems such as CAD/CAM to achieve continued improvement of our process and the quality of the services we offer.
High technology facilities
By means of our modern engineering and production facilities, Stork Turbo Blading is able to meet the requirements of our customers. Our facilities are equipped with the latest 3D Design and Manufacturing tools, 65 high accurate 4- and 5 axis CNC milling machines. All products are being checked and monitored continuously during production which is resulting in a Lean production environment. To stay competitive, Stork has its own Lean Manufacturing program called “SMART”, which is covering multiple optimization projects per year.
3D-scanning service and capabilities
In case you have requirements for your turbo machinery, we offer you our digitalization services. These services can be executed in our shop or on-site, through optical 3D scanning technology. We offer this service globally.
DIRECT SUPPORT MORE INFORMATION
Special Services & Processes
We offer a range of specialized processes including but not limited to:
- Moment Weighing, Fitting Proposal Chart
- Balance Weighing, Fitting Proposal Chart
- Frequency Measurement and Analysis
- Shot Peening
- Structural and Material Analysis
- Assembly of Segments
- Segmented Designs (Welding, Stamping, Etc.)
- 3D Scanning
- Reverse Engineering of Components
- Magnetic Particle Inspection
- Fluorescent Penetrant Inspection
- Turbine Blade Damage Assessment and Repair
- Coating
- Spectral / Optical Material Analysis
- Positive Material Identification
- Ultrasonic and Radiographic Examination
- And Much More
Contact us
Finding the right model
Popular Models
General Electric
MS3002 (Frame 3)
MS5001 (Frame 5)
MS6001 (Frame 6)
MS7001 (Frame 7)
MS9001 (Frame 9)
Siemens
SGT-200 (Tornado)
SGT-600 (GT10B)
SGT-1000F (V64.3)
SGT-2000E (V94.2)
Alstom Power
In 12 months of Stork

Deliveries
produced
satisfaction
serviced