Stork

Steam turbines

Lifecycle services to ensure steam turbines run at peak performance. 

Peak performance

Turbines are expensive and production-critical pieces of equipment that need to be up & running at peak performance at all times. Avoiding unplanned downtime and extracting the maximum energy output, rank high on the wish list of most asset owners.

While being a stand-alone piece of equipment, turbines are typically intimately integrated with other equipment like gears, generators, pumps and valves. During maintenance, this can lead to many interfaces.

Integrated services

Building on over 150 years of steam turbine experience, clients can rely on quick response times and speedy turnarounds, allowing us to maximize operability and reliability, while reducing operating costs. We service all major OEMs (Siemens, GE, ABB/Alstrom, Rolls Royce, Toshiba, MAN, Dresser Rand) and thanks to similar in-depth knowledge related to gears, compressors and generators, we can provide truly integrated services. 

How we make the difference!

Fast response

24/7 support to keep your turbines running at peak performance.

One-stop shop

Our integrated approach enables flexible, low-cost execution and single contractor responsibility for the complete centre line equipment.

Maximized uptime

We help avoid unplanned downtime through accurate diagnostics and preventive maintenance.

Equipment efficiency

Our solutions enable energy-efficient and smooth operation.

Safety

Our teams exhibit an uncompromising commitment to safety.

Condition test, blogs and reference videos steam turbines

Turbomachinery condition testAre you getting the most out of your steam turbine?

The process of using steam turbines to generate electrical energy is complex and has many parameters. When circumstances or steam turbines usage changes, performance may suffer or failures may lurk. This also has implication for your maintenance strategy. 

Are you getting the most out of your steam turbine?

ReferenceOutage of a 50MW Concentrated Solar Plant

Stork performed an overhaul of a 50MW steam turbine generator at a concentrated solar plant in Spain. The complete overhaul was executed under tight COVID-19 restrictions, and delivered 4 days ahead of the planned schedule. 

Client referenceSteam turbine overhaul
We performed a major overhaul on a 19,9MW Siemens steam turbine, type EK1100-2 including the gearbox and a modification of the hydraulic control system to electronic.
Location spotlight Almere - The Netherlands
Location spotlight Essen - Germany

Get in touch with us

Interested in learning more about our services? Let's have a talk! 

Our Subject Matter Experts take the time to discuss your existing challenges and help you make smart decisions that best meet your needs.