Attero Wijster / Boiler Modifications
Introduction:
Due to shorter lifetimes of Ovo’s and an increase in unplanned stops customer Attero Wijster contacted Stork Thermeq for a consultancy study in order to improve the reliability, optimize the energy production and improve plant maintainability.
Scope:
- Conceptual, Basic & Detail Engineering for this modification
- Manufacturing of Ovo’s (plasma cladding – Inconel 686)
- Assembly of Ovo’s
Project results:
- Optimized output by changing the configuration
- Increased reliability
- Less unplanned outages Improved maintainability
- Optimized protection from corrosion