Jetty Project at Atlantic LNG
Challenge
After conducting an independent audit Atlantic was advised of the need to arrest corrosion on its jetties with urgency.
Solution
The company explored several avenues after deciding on an alternative option, rope access.
Client Benefits
- Cost-saving with use of rope access vs using a barge.
- Saved on logistics costs and resources.
- Minimal impact on operations
Safety Excellence
The positive safety culture was evident throughout this project as it was completed with no LTIs or injuries.
Project Fast-Facts
Project | Atlantic Jetty Project |
Client | Atlantic LNG |
Location | Trinidad and Tobago |
Services | Fabric Maintenance, Rope Access |
Date | 2015 |