Benefits

Benefits

SPACE
Small and light, the mobile units require 30m2 and can even be safely stacked to further reduce footprint.

TEAM
Five-strong offshore crew requiring less helicopter seats and bedspace onboard platforms.

COST
Workscopes delivered more quickly than traditional methods (7 days), minimizing shutdown costs.

SAFETY
Absence of confined space entry reduces physical exertion and exposure to harmful chemicals.

PERFORMANCE
Reduce costly equipment downtime, enhancing performance to enable maximum efficiency and profitability.

ENVIRONMENT
Sand cleaned and safely returned to sea, reducing environmental impact and avoiding onshore disposal.

PREVENTION
Preventative approach to sand management eliminates unplanned shutdowns.


OPERABILITY
ATEX compliant in Zone 2, designed to guarantee safe connectivity and interoperability with existing infrastructure.

Contact us