Hot Bolt Clamp - BP Skarv FPSO

Stork was contracted by BP Skarv FPSO to remove and replace the corroded bolts on flare system flanges'. The project was delivered with no time lost incidents and within the tight work schedule during hazardous weather conditions.

Downloads

pdf HBC_BP_Skarv_FPSO_Case_Study 340 KB Download
Share this article