NDT - Conductor inspection
Stork was challenged to inspect and clean a 144 meter long conductor on a North Sea offshore platform. The objective was to evaluate the condition of the conductor to ensure its integrity and confirm its conformance with HSE legislative standards.
Descargas |
|||
---|---|---|---|
![]() |
Inspection__NDT_Conductor_Inspection_Case_Study | 212 KB | Download |