Through the delivery of high profile relocation projects for the likes of Shell and DSM, Stork has over 20 years’ experience in managing the complete relocation of onshore production facilities. For each project, our key drivers are to maintain installation integrity throughout the full process while delivering first-class HSEQ performance at all times.
DSM nitric acid plant
Relocation engineering, Dismantling, Packing, Transportation and Re-assembly of DSM Nitric Acid from IJmuiden to Geleen.
- 9.100 Freight tons
- 2.600 Metric tons
- Execution: 2009/ 2010
Relocation Heinz
Relocation engineering, Dismantling, Packing, Transportation and Re-assembly of Complete Production facilities from H.J. Heinz-Sneek and Baarn to H.J. Heinz-Maarssen.
- 2.500 Freight tons
- 350 Metric tons
- Several modules and loose equipment
- Execution: 2006 / 2007
Relocation paper projects
Relocation engineering, Dismantling, Packing, Transportation and Re- assembly of Production lines from Paper Projects- Dinxperlo to Doetinchem.
- 1.250 Freight tons
- 65 Metric tons
- Loose equipment and Utilities
- Execution: 2007
Relocation Fokker 50 flight simulator
Relocation engineering, Dismantling, Packing, Transportation and Re- assembly of a Flight Simulator with ancillary equipment from Schiphol Oude Meer (Fokker Services) to Nieuw Vennep (Fokker Services).
- 200 Freight tons
- 50 Metric tons
- 1 Module and equipment