Stork

Attero Wijster / Boiler Modifications and improvement

Information

Region

Europe

Industry

Upstream oil & gas

Associated capabilities

Challenge

Due to shorter lifetimes of Ovo’s and an increase in unplanned stops customer Attero Wijster contacted Stork Thermeq for a consultancy study in order to improve the reliability, optimize the energy production and improve plant maintainability.

Solution

• Conceptual, Basic & Detail Engineering for this modification

• Manufacturing of Ovo’s (plasma cladding – Inconel 686)

• Assembly of Ovo’s

Benefits

• Optimized output by changing the configuration

• Increased reliability

• Less unplanned outages Improved maintainability

• Optimized protection from corrosion