Vessel clean, inspect and recoat on North Sea installation
Information
Challenge
Stork was contracted to provide equipment and manning to clean, inspect and fully recoat vessels as required on a North Sea Installation.
Solution
Recognizing the clients’ needs Stork mobilized a team of 25 personnel who were fully trained technicians utilized UHP jets to remove existing internal coatings. The resulting waste was transferred to skips using 3” diaphragm pumps, ensuring no environmental spills. To prepare for optimum repairs and recoating, surfaces were dry blasted prior to the application of Corrocoat products, ensuring long term protection against corrosion.
Benefits
Stork’s flexible approach to this contract and a strong relationship between both parties allowed the workscopes and strategies to be agreed and facilitated efficiently. Quality communication and meticulous planning ensured that the project was delivered with no time lost incidents or environmental spills within the allotted time frame.
“I would like to single out Stork’s crew for a special mention. Nothing is ever a problem for them. They are well supervised and can be trusted to deliver results in a safe and responsible manner. I would happily have them on any installation that I have responsibility for at any time.”Offshore Installation Manager - Major North Sea Operator
Project details
Location: North Sea
When: 2013
Resources: Specialist Cleaning
Safety: Project delivered with no lost time incidents
Environmental: No environmental spills occurred during workscope
Workscope completion: The workscope was completed on time and on budget