Gearbox redesign and delivery - QSGTL
Information
Client
QSGTLr
Region
Pearl Gas-to-Liquids (GTL) plant, Qatar
Industry
Refining and petrochemicalsAssociated capabilities
Challenge
Qatar Shell GTL (QSGTL) faced several failing gearboxes in a critical part of the Pearl Gas-to-Liquids (GTL) plant. A peak load of 63.9kN-m was experienced during start-up and the existing gearboxes had a 44.5kN-m threshold.
Solution
Shell invited Stork for an in-depth engineering study into the failing gearboxes, following Stork Oryx Turbo Machinery Services’ successful participation in major turnarounds for Shell in 2015 and 2016.
The engineering study, executed by Stork Gears in Rotterdam, identified the gear sets could be redesigned to enable the gears to withstand a minimum peak load of 65kN-m during startup. This resulted in Shell awarding Stork a three-year contract for the delivery of 100 redesigned gear sets (see image right) for the GTL plant.
This integrated way of working is an excellent example of how Stork improves asset reliability and performance, while working with its Clients to find optimal solutions to all challenges.
Benefits
Increased reliability
Stork’s solution will deliver improved asset reliability without large and expensive asset modifications.
Significant cost-saving
Stork’s offer was impressive and delivered a better price per unit.
Gearbox improvements
Stork shared it’s knowledge and expertise with Shell’s engineers to improve the existing gearboxes.
Project details
Services: Rotating equipment, gears services
Date: 2016-2019